Highview Condominium II The twelfth regular meeting of the 2004-2005 Highview II Board of Directors
was called to order at approximately 7:45 p.m. by Marjorie Cannon, Vice
President. Board members in attendance: Victor Bellini, Miriam Biren, Robert
Boynton, Marjorie Cannon, Tamara Keshecki, and Richard Re. Board members absent:
Stefanie Greenberg and Frank Mattera. Jennifer Ogman attended from J.A.L.
Diversified Management. 1) Appointment of Al Lamoglia as Board member: Due to the September
30,2005 resignation of Sanchie Bobrow, the board was required to appointment a
replacement prior to other business. Per bylaws, the appointment is made by the
current board members and is valid until the general membership’s next annual
meeting and elections. Between September 30th and October 3rd, board members
nominated Anna Civitano, Nora Colford, and Al Lamoglia. All nominations were by
email in accordance with the board’s formal method of conducting business
outside of board meetings to provide a formal record of decisions. Nominations
were closed on 10/03/05 and an email vote was started by the Secretary. Boynton
reported that email votes were received from only Bellini, Boynton, Keshecki,
and Re. With only half of the board members voting, none of the three candidates
had been elected prior to this evening’s meeting. By incorporated the email
votes, the additional votes of Miriam Biren and Marjorie Cannon at this meeting,
and negotiation to achieve consensus; the board voted to appoint Al Lamoglia
(Bellini, Boynton, Cannon, Biren, Keshecki, and Re). 2) Approval of July Minutes: Noting insufficient response from the
board by prior emails, minutes of the July 13, 2005 meeting were approved at
this meeting. The Secretary will post the approved July Minutes and now
distribute September minutes for email approval. 3) Repairs and maintenance: a) Boiler repairs: Following a hot water failure on 10/12/05, JAL
requested that the board consider approval boiler repairs (a new mixing valve
$4,200. and hot water coil $4,700.). A second bid of $4,100 for the mixing
valve was received from RSK Plumbing who indicated that the hot water coil
replacement was not necessary (previously replaced). It was explained to the
Board that until this repair was made, the boiler would be unable to provide
adequate heat and hot water to the building at the same time. An email vote
was begun by the Secretary on 10/12/05, however as of this meeting, only four
board members had voted (Bellini, Boynton, Keshecki, Re) and the repair was on
hold. The Board voted at this meeting to approve RSK Plumbing’s bid of
$4,100 (Bellini, Boynton, Keshecki, and Re in favor. Biren abstaining).
Greenberg was telephoned at this meeting and cast a fifth (majority) vote. b) Garage Exhaust Timer: The Board approved Christie Overhead door’s
estimate for a new exhaust fan timer for the garage door. It was noted that an
estimate for this work had previously been approved at the Board’s October
2004 meeting, but was delayed after Ogman advised the board in January 2005
that the super could do the job for less. After reporting at the March board
meeting that the super would not be able to perform the work, Ogman indicated
that she would go back to the approved October 2004 bid and complete the
installation. c) Painting & smoke detector battery replacement: i) Rob has painted the elevator saddles, chute room doors, and is
currently painting all apartment unit doors. According to JAL, seventeen
doors had been painted and smoke detector batteries replaced. It was
questioned whether the super was actually replacing the smoke detector
batteries, since conversations with four randomly selected unit owners
indicated that the battery replacement had not been offered by the super.
Ogman will follow-up immediately with the super, since this combined process
was to create the least inconvenience to unit owners. ii) Concerns were raised about the temporary helper hired per JAL’s
recommendation to assist with regular maintenance while the super was
painting. It was noted that although the temporary helper worked on the
previous Wednesday, no paint work was scheduled that day. Also since the
super was only painting doors from 10:00 a.m. to 2:00 p.m., the majority of
owners were not home during that time period to schedule their doors, and
the smoke detector battery replacement had not been offered, the board
questioned JAL’s staffing request and Ogman’s oversight in this matter.
Ogman indicated that the helper would be discontinued at once. d) Plumbing: Ogman was asked about the pressure gauge that was to be
added to the new water pressure valve. This question had been raised at the
September meeting and she indicated that the gauge was to be added later that
week. She was unable to confirm at this time whether the gauge had been added
or not. e) Front Door area: Ogman was asked about grease marks on the front
doors that had been pointed out at the September meeting but had not been
removed. Ogman indicated that they would not come off, but when the board
accompanied Ogman to the front door with cleaner and a paper towel a thick
layer of built up was quickly removed. f) Compactor Room: The Board accompanied Ogman to the compactor
room. The personal storage and inadequate (daily) washout concerns discussed
in the spring had not been corrected. The hose necessary for daily wash-out of
the room was not found in the room, debris and compression liquids were noted
under the compactor, and the floor was dirty with a build up. The presence of
personal storage was questioned again and when computer boxes were opened,
roaches exited the boxes. Roaches were also noted on the floor. The board
discussed this situation as a management failure and why such a chronic
situation had been allowed to develop and continue – particularly after the
board had walked Ogman through the room earlier in the year with their
concerns. g) The garage maintenance problems were discussed again. The garage
was washed out about a month ago for the first time in about a year. It was
previously pointed out to JAL that this is supposed to be done on a month
basis. It was noted that when sewer backups occur in the building, even toilet
paper is occasionally left on the garage floor and health hazards presented by
not cleaning this floor on a regular basis. JAL was reminded that parking
space owners pay about $300 per month for parking area maintenance. Discussing
last month’s wash-out, it was noted that piles of mud remained 5’-10’
surrounding a couple of the drain areas and there was no follow-up cleaning in
the days that followed. The accumulation of plumbing pipes, boards, and grease
mentioned at the May 11, 2005 board meeting still remained and Ogman was
reminded that it is the responsibility of JAL to assure that nothing is stored
in the garage except motor vehicles according to the parking rights defined of
"limited common space" and the Board’s understanding that loose
items in the garage present liability issues for the building. h) Litter on grounds: There was discussion of 20-50 orange plastic
bags that littered the Clove Road curb of Highview for almost a week and
clogged a storm drain. Although NYC is responsible for cleaning storm drains,
it is the super’s responsibility for keeping the Highview property free of
litter. It was noted that a couple residents had picked up the bags after
several days and cleaning up this was the super’s responsibility as matter
of keeping the Highview free of litter. i) Maintenance Committee: A copy of the form being utilized by the
committee was distributed. The board agreed to have an informal meeting within
the next couple weeks and review the process. Although the board requested
that that Ogman include copies of her weekly maintenance reports in the
management package distributed at board meetings by JAL, the reports were not
included in this month’s package. 4) Highview II board presidency: At approximately 9:00 p.m., there was
a discussion of the board’s presidency. It was noted that the topic had been
held until Stefanie Greenberg arrived in the hope that she would participate in
this deliberation, but by 9:00 p.m. it was agreed that she would probably not be
attending the evening’s meeting and the discussion began. It was noted that
Greenberg had only attended two of the board’s nine regular meetings in 2005
(January and April), and had been absent from the other eight meetings
(February, March, May, June, July, August, September, and this October meeting).
As an organizational issue, the Vice President who would ordinarily be expected
to chair these critical meetings had not been briefed by the president to lead
discussions in her absence. There was a discussion of the crucial and active deliberations of the board;
particularly those related to the building’s approximate $300,000 in capital
projects, contract oversight, and legal review. There was discussion of a crisis
in daily building management and maintenance issues. The president’s refusal
to implement several duly board voted decisions in recent months was discussed.
It was noted that the primary role of the president is to facilitate the flow of
information between the board’s nine members, to act as the primary person
sharing all information to and from the managing agent, and to assure that all
actions are approved by the necessary majorities in accordance with bylaws are
then implemented. It was noted that board member concerns relating to
fulfillment of these presidential responsibilities had been shared in emails
with the full board and its president over a number of months. It was agreed that Greenberg had been acting in what she perceived as the
building’s best interests. However it was agreed that the responsibilities of
the presidency might at this time be better met by a board member with more
available time for board management and greater attention to the building’s
bylaws. The board asked Richard Re if he would accept the board presidency if so
voted. Richard Re said he would accept. A motion was then made to request
Greenberg’s resignation from the presidency and as soon as this could be
conveyed to her, the election of Re would be considered complete. Motion
seconded and the board so voted without dissent. Richard Re was thanked for
accepting the responsibilities of the presidency. Victor Bellini was asked to
convey this decision to Greenberg and agreed to do so. In making this decision, the Board requested that Bellini convey its thanks
to Greenberg for her efforts as president over the last 3 years. As a continuing
member of the Highview II board, her viewpoint and ongoing participation in the
Board’s efforts will remain as valued as ever. 5) Finance a) Building loan: Closing was completed on October 6, 2005 and monthly
assessments have begun for those unit owners participating in the loan.
Approximately 22 unit owners completed a full payment of their shares by the
required September date. b) Telephone bill: There was a discrepancy in the telephone bill for
the entrance system’s modem line. This line is only for incoming data calls
(system updates), but there appeared to be a number of outgoing long-distance
calls on the bill. JAL will investigate with Verizon and report back to the
board. 6) Roof replacement project – updates since regular meeting on the
full-Board in July: a) HVAC estimate: Fahrenheit HVAC, Ltd. has not provided a revised
contract. Fahrenheit did attempt to connect an exhaust fan to the
"A" kitchen line, but were unable to provide any flow due to
construction debris and/or garbage found lodged in the duct. b) Electrical contractor for HVAC: Since Fahrenheit HVAC’s bid
specifically states that they will not connect the new units to electrical,
bids will be required by the board from electrical contractors to hook up the
fans. Ogman will get the multiple bids for Board review. The Board will need
to approve an electrical contractor in time for participation in the
pre-construction meeting. c) Pre-Construction meetings: As authorized at the September
meeting, Boynton signed the Becht Phase-3 contract on behalf of the Highview
II board and forwarded to Becht Engineering. A copy of the signed contract was
forwarded to JAL in order for the initial $10,000 payment to be made to Becht.
Once again, it was noted that this contract had been previously approved in
June by eight members of the board, however the president had never signed the
contract and forwarded to Becht Engineering for them to begin Phase-3
meetings. d) Summarizing next steps: Meeting was adjourned at approximately 10:30 p.m. Robert Boynton, Secretary
Board of Directors - Meeting Minutes
October 20, 2005, 7:30 p.m.