Highview Condominium II The fourteenth meeting of the 2004-2005 Highview II Board of Directors was
called to order at 8:15 p.m. by Richard Re, President. Board members in
attendance: Victor Bellini, Miriam Biren, Robert Boynton, Marjorie Cannon, and
Richard Re. Board members absent: Stefanie Greenberg, Al Lamoglia, Tamara
Keshecki, and Frank Mattera. Irwin Chopak attended from J.A.L. Diversified
Management. 1) Minutes: Minutes of the November, 9, 2006 board meeting were
approved. 2) Violation appeal: A unit owner had requested and been scheduled for
a 4th appeal of two January 2005 rules violations/fines. The unit
owner did not appear. 3) Roof replacement update: a) Contract with S&S Roofing signed on 12/22/05. The contract
for roof replacement was approved by the building's attorney and signed by the
board president on 12/12/05. The contract was forwarded to S&S, who signed
and returned the contract on 12/22/05. The initial AIA-type contract-draft provided by S&S in August/September
was discarded in December 2005 after S&S Roofing proved unable to provide
critical portions of the contract for the building’s attorney to review. The
final approved contract agreement was an engineering-type contract-draft
originally offered by Becht Engineering in May 2005. The engineering-type
contract-draft had been declined by Greenberg and Ogman in favor of allowing
S&S to write their own architectural-AIA type contract. Once the AIA
design contract was discarded in late November and the engineering-type draft
was agreed upon in consultation with Becht Engineering, the final contract was
determined to be appropriate and complete by the building’s attorney Michael
Swaaley and was approved. b) There was a discussion of construction start dates. Concerns
about winter weather and T-Mobile’s participation in the project in
scheduling the moving of their equipment from the roof surface and bulkhead
wall were discussed. S&S had previously indicated to Becht Engineering
that the project could not be scheduled until there had been a
pre-construction meeting on the roof with T-Mobile. Irwin indicated that
S&S has not returned his recent calls. The Board anticipates that the
project will begin in late March or early April, and according to S&S will
take 2-3 weeks to complete. c) Exhaust fan system: Irwin indicated that he was not up-to-date on
the matter, but will contact Becht Engineering and schedule the joint Becht
Engineering / Chutemaster inspection. It was reviewed that the contract for
ventilation system analysis with Becht had been approved on November 1, 2005
with modifications completed November 15, 2005. As part of the analysis, video
support work would be necessary and Jennifer Ogman had arranged with this work
with Chutemaster after receiving the Board approval. It was agreed that this
complete analysis, any necessary repairs to the system, and fan replacement
work should be completed prior to work beginning on the roof replacement if
possible to avoid the risk of damage to a new roof. Winter weather should have
no impact on full completion of the ventilation system project. d) Summarizing next steps with roof: 4) Riser valves and water service line replacement update: a) Plumbing work completed in December. RSK had been asked by Irwin
Chopak to hold up on the laundry room and recycling area sprinkler head
additions on account of concerns with their bid. Irwin reported that RSK went
ahead with the work anyhow and he recommends that the Board renegotiate with
RSK to match a less expensive bid he had received. The board voted in
agreement. b) Lobby ceiling replacement revision/approval: On November 27th,
Rich Re requested an email vote for the revised ceiling replacement. Multiple
bids were received by Irwin Chopak. Bellini, Boynton, Cannon, Keshecki,
Mattera, and Re voted in favor of the Parker bid at $6,728. Votes were not
received from Biren, Greenberg, and Lamoglia. The vote was concluded on
11/28/06 with an approved estimate to include skim coating and painting of the
central lobby ceiling, repair and/or replacement of all ceiling lighting
fixtures, installation and finishing of sheet rock ceiling and suspended
ceiling. The contractor who had removed the old ceiling was paid for removal work
performed and while the replacement work to be performed by this contractor
was cancelled. Payment was reduced from $3,800 for the full job to $1,900. c) Discussion of lobby ceiling current status: As of this evening’s
meeting, the new suspended ceiling panels are not fitting correctly (bowing up
at the sides because they are too tight along the walls), the cross members
are not attached properly where they meet the wall-edge frames, the ceiling
light fixtures are not aligned with each other and being recessed fixtures
cannot run in the exact center of the hallway on account of pipes close above,
and although a requirement of the project the new ceiling panels cannot be
easily removed by plumbers for regular access to the riser valves or panel
replacements by the super as needed. A board member questioned why the north
hallway (towards laundry room and unit L-C) had been done as suspended
ceiling, since the concentration of valves only existed on the south hallway
(towards L-H) and the north hallway was separated by a doorway so there were
no issues of aesthetic balance between the two ends. Concerns were also raised
with the central lobby area with painting that looks patchy. The board agreed
that the current paint job is unsatisfactory and incomplete. Irwin will review with contractors and report back to the board with a
comprehensive plan addressing all concerns. The board agreed that the
completed project must provide a professional appearance, offer plumbers
regular functional access to all valves 60 valves, and allow for easy
replacement of ceiling panels by the building super as they become damaged or
worn. At the moment, it was agreed that none of these requirements have been
satisfied. 5) Update on other capital repairs: a) Revised/improved bid estimates for other capital repairs: Irwin
Chopak has obtained additional estimates for the fire escape
restoration/painting, repair of cracked entrance area tile, garage and parking
lot painting. Estimated savings totaled approximately six thousand dollars. No
action was taken on approving bids at this time. b) Awning and frame replacement: For the benefit of the building’s
new JAL manager, the board reviewed awning framer replacement and the November
meeting’s decision to delay replacement to the FY2006 budget year. Boynton
and Cannon had been authorized to work with management to review replacement
options and present their final selection to the full-board for final
approval. It was noted that Access-a-Ride has already made payment to Highview
for the full replacement of the awning and frame in response to the damage
caused by their van. Irwin will meet with Boynton and Cannon to discuss
options. It was noted that the top corner lights on the awning are no longer
serviceable according to Walsh Electric and will require replacement at the
same time. Lights under the awning are approximately 5 years old. c) Carpeting estimates: Due to a bleach stain on the first floor and
a polyurethane spill on the third floor, the Board anticipated replacing the
building’s hall carpeting through the regular maintenance budget at two
floors per year. It was agreed at this meeting that Boynton and Cannon will
work with Chopak to research replacement carpeting options. 6) Financial report: a) Common charge increase: On November 21, 2005, a special meeting
was held to determine if a common charge increase would be necessary for the
new budget year. The meeting was attended by Victor Bellini, Robert Boynton,
Marjorie Cannon, Tamara Keshecki, Al Lamoglia, Frank Mattera, and Rich Re.
Miriam Biren and Stefanie Greenberg were absent. As outgoing Treasurer, Rich
Re presented three budget options for FY2006 based on common charge increases
of 0%, 3%, and 6%. As Rich Re's figures indicated, a 6% increase would most
closely approximate an allowance for the anticipated increase energy costs for
heat and hot water. The 6% increase was approved by six board members Victor Bellini, Robert
Boynton, Marjorie Cannon, Al Lamoglia, Frank Mattera, and Rich Re. Tamara
Keshecki voted for 4% increase. Stefanie Greenberg voted by email on November
22nd for the 6% increase. b) Landscaping bill: Highview has recently received a bill from Gary
Landscaping for the last two full years of lawn maintenance totaling
approximately $26,000. Irwin Chopak indicated that since it was a contract
that specified when the payments were to be made by Highview, Gary Landscaping
was not required to send a monthly statement. The board questioned the
situation, why JAL had not made payments as specified by the contract, and why
the Board’s outside auditor Alfred Johnson had not caught this situation in
reviewing all active Highview contracts. A board member cited his repeated request of the board that the budgeting
system in use by JAL for Highview should fully encumber funds in the budget at
the point that projects and contracts are first approved. Irwin will investigate and report back to the board. c) Capital repairs: No expenditures-to-date report was available at
this meeting for the Capital Repairs being supported by the building loan. d) FY2005 Audit: The board determined that an accounting firm for
the fiscal year 2005 audit has not been engaged. Irwin was asked to review
situation, noting that the annual meeting requires that the completed audit be
sent to all unit owners at least 10 days in advance of the meeting. e) Completed audit for annual meeting: As soon as the FY2005 audit
is completed, a combined FY2004 and FY2005 annual meeting will be scheduled.
Possible dates to be reviewed once engagement letter is signed with auditor.
However since auditor was not engaged in the fall, date that the audit can
begin is uncertain. Treasurer will need to discuss with Alfred Johnson. Board member then questioned continuing with Johnson. Chopak suggested
considering less expensive auditor he has worked with in the past. Board
member indicated that degree of sampling performed by auditor is what
typically controls audit cost, but felt that the auditor previous to Alfred
Johnson (Desantis and Shall) had performed significantly more sampling and
offered more significant feedback to the board than Johnson. It was noted that
John Lipuma had indicated to the board that Johnson had not sampled at the JAL
office at all. On account of the lateness in beginning the FY2005 audit, board members
felt that it was too late to change auditors for FY2005. 7) Legal issues: a) Lease rule violations: Two units remain in violation of lease
rules and subject to legal action. b) Delinquent common charges: The delinquent common charge accounts
of two unit owners are with Michael Swaaley for legal action. The building’s
legal costs in these actions become the responsibility of the delinquent unit
owners. c) The Board discussed board membership responsibilities and
suggested resignation guidelines: i) Discussion of attendance: In recent months, board members have
waited for as long as an hour before achieving the quorum of five board
members necessary to call a meetving to order and conduct business. On one
occasion three members spent an hour waiting in the lobby with a JAL
representative before a fourth member showed, but were still unable to
achieve a quorum and disbanded without conducting the meeting. ii) Encouraging board members to offer notice if unable to attend:
In order to avoid wasting board members time and the uncertainly this
creates in conducting the business of the corporation, the email RSVP was
resurrected several months ago to either assure a quorum or provide the
adequate notice to cancel and reschedule meetings without significant
disruption. The board secretary has been sending an email reminder with
requested RSVP. However only a minority of board members have responded in
each case. It was noted that most board members were able to comply with
this RSVP process by email in past years – to the common benefit of the
board and all unit owners in assuring timely discussion of all business
before the board. It was noted that this problem with email response has
gone beyond attendance plans at board meetings, extending to email votes
between board meetings which in order to provide a record of proceedings are
the only authorized method agreed upon for the board to conduct business and
formal voting between board meetings. iii) Replacing inactive board members. The board discussed the
additional burden inactive board members place on the active participating
ones. Bylaws Article II, Section 5 (Removal of Members of the Board of
Managers) states: "At any regular or special meeting of unit owners,
any one or more of the members of the Board of Managers, other than a member
designated by the Sponsor, may be removed with or without cause by a
majority of the unit owners and a successor may then and there or thereafter
be elected to fill the vacancy thus created. Any member of the Board of
Managers whose removal has been proposed by the unit owners shall be given
an opportunity to be heard at the meeting." iv) Board action: Although a forced removal requires a unit owner
meeting per bylaws, the board needs to achieve a quorum in order to legally
conduct business. In order to support the board’s legal responsibility to
unit owners, the board voted to establish a written guideline to be used in
requesting the resignation of inactive board members. Richard Re recommended
the guideline of "missing four meetings over the course of a calendar
year". Boynton recommended "three consecutive unexcused
absences". Re and Boynton agreed develop a common guideline and present
an exact wording for the board to approve at the next board meeting. So
voted by the board members present. This guideline does not have legal
standing, but will provide a basis for supporting voluntary resignations. 8) Repairs and maintenance: a) Maintenance Committee: As directed by the board, Anna Civitano
and Marjorie Cannon have been maintaining a weekly report of building
maintenance items and Civitano has been walking with JAL’s building manager
on his regular weekly inspection of the building. Utilizing the spreadsheet
report compiled by Boynton and Bellini, Civitano is transitioning to the
computerized report. It was agreed that the Committee will submit a report to
Irwin Chopak by email, with a copy going to the board secretary for archives
and board meeting discussions. With the progress Irwin Chopak is hopefully
making in getting the building back on track, it was recommended that Civitano
and Cannon will submit one inspection per month, to be completed and submitted
the week before the board’s regular monthly meetings. This report will
provide up-to-date and comprehensive information for board meeting discussion.
The board so voted. b) Garage Exhaust Timer: The new timer for the garage door’s
exhaust fan was installed in December and noted to be operating properly.
However as of this evening the fan is not operating. The repairman will be
called in tomorrow to investigate. c) The front entrance door was discussed. It has not been locking
for several days. Irwin indicated that the super had not told him of the
problem. It was agreed that according to the critical nature of building
security, the repair should have been made within hours not days. This led to
a discussion of the communication policy between JAL management and the
building super. Unit owners should file all repair and maintenance requests
directly with JAL and Irwin, ideally through the Highview2.com website’s
repair request system. d) Painting & smoke detector battery replacement: Per the
Maintenance Committee’s report, at least twenty doors have still not been
painted. There was no update on which units have had their smoke detector
battery replacements completed. e) Elevator’s mechanical systems: There was discussion of the
elevator’s overall condition and the nature of repairs in the last year.
Irwin recommended an independent analysis and report. Irwin will provide bids. f) There was discussion of the Verizon terminal box. Irwin believes
that Verizon may be willing to replace the box with an updated system. This
might allow for extra services requiring fiber optic lines. g) Per discussion about the Maintenance Committee, all other regular
repairs and maintenance issues were tabled for review of the weekly reports
and next month’s review of progress at the board meeting. The meeting was adjourned at approximately 10:00 p.m. Robert Boynton, Secretary